
Overview
Assiut Plateau Bridge comes within the Assiut plateau axis road project. The bridge path starts from the ring road in Al-Moallem behind Assiut Mills and intersects with the railway line and Assiut Al-Ghanayem Road, up to kilo 17 in the plateau next to the exit of Al-Sail with a length of 1.5 km. The bridge links the city of Assiut with the new city of Nasser with a total budget of about 457 million pounds.
Client
The Arab Contractors
Location
Assiut, Egypt
Scope of Work
- Complete Structural Design Package
- Design Review & Coordination for all disciplines
- Technical Support Services
- Complete Structural Work Shop drawing Package